DHS LOGISTICS / ROAD TRANSPORTATION

From first mile
to final delivery.

Domestic cargo movement connecting factories, warehouses, ports and final delivery points. Vehicle choice and routing are planned around packed dimensions, weight and site access.

Discuss your shipment
01 / LOAD OPTIONS

Your cargo volume.
The right road option.

Compare dedicated and shared vehicle capacity. The final vehicle and movement plan depend on cargo size, weight, route and availability.

FTL

Full Truck Load

Capacity dedicated to your cargo
Dedicated capacity for your shipment.

Plan a dedicated vehicle around your cargo volume, handling and route requirements. Suitable when the load or delivery plan calls for separate vehicle capacity.

  • Dedicated vehicle planning
  • Cargo-specific body and capacity
  • Pickup and delivery schedule coordination
Discuss FTL requirements
PTL

Part Truck Load

Your cargo + other shipments
Shared space for smaller shipments.

Use part of the vehicle capacity where a suitable consolidation service is available. Cargo compatibility, handling and delivery timing are reviewed before planning.

  • Shared vehicle capacity
  • Consolidation subject to suitability
  • Handling and delivery scope confirmed
Discuss PTL requirements

Truck illustrations show capacity allocation only. They do not represent a specific vehicle size, payload or loading plan.

02 / CONNECT THE LOCATIONS

Every location.
A connected movement.

Plan the road legs between production, port handling, storage and your receiving point.

FactoryProduction & pickup
PortImport / export gateway
WarehouseStorage & dispatch
Final deliveryReceiving location
ROAD LOGISTICS
MOVEMENT OPTIONS
01Factory to PortAlign production dispatch with the port handover.
02Port to WarehouseConnect arrival and release with storage requirements.
03Warehouse to PortCoordinate outbound cargo for export movement.
04Last-mile DeliveryPlan receiving hours, unloading and site access.

Illustrative connections, not a geographic coverage map. Routes, vehicle access and service availability are confirmed for each shipment.

03 / VEHICLE PLANNING

Cargo first.
Plan the right vehicle.

Look beyond vehicle size. The route, loading conditions and final receiving point all shape the movement plan.

01 EQUIPMENT FIT

Container Transportation

Match the trailer to the loaded container.

Discuss 20 FT and 40 FT container movements with suitable trailer arrangements, load limits and port access requirements.

PLANNING CHECKS
  • Container size & gross weight
  • Trailer suitability & port access
  • Loading and receiving arrangements
02 ROUTE READINESS

Interstate Logistics

Plan the route beyond the pickup point.

Bring locations, movement documentation, route constraints and site schedules together for the agreed interstate scope.

PLANNING CHECKS
  • Pickup & delivery locations
  • Route and movement documentation
  • Site schedules & access constraints
03 DELIVERY ACCESS

Last-mile Delivery

Prepare for the final handover.

Confirm receiving hours, unloading support, vehicle access and the delivery contact before dispatch.

PLANNING CHECKS
  • Receiving contact & delivery hours
  • Vehicle access at destination
  • Unloading equipment & support
Before confirming a vehicle

Share packed dimensions, gross weight, loading method and site access details. Final suitability and service availability are confirmed for each shipment.

Discuss vehicle requirements
04 / BEFORE DISPATCH

Ready to load.
Ready for the road.

Align the cargo, vehicle and receiving arrangements before the movement begins.

  1. 01Assess

    Check the cargo

    Review package count, packed dimensions, gross weight and loading access.

    Cargo details reviewed
  2. 02Arrange

    Confirm the movement

    Agree the vehicle, route, pickup schedule and site contacts.

    Vehicle & route agreed
  3. 03Load

    Prepare for the road

    Coordinate loading support, cargo positioning and securing responsibilities.

    Loading & securing coordinated
  4. 04Handover

    Complete the delivery

    Confirm receiving requirements, unloading support and delivery acknowledgement.

    Receiving plan confirmed

Planning checkpoints, not a live shipment status. Loading, securing and unloading responsibilities must be agreed before dispatch.

PLAN WITH CONFIDENCE

What to share for a useful quotation.

Your shipment checklist

  • Pickup and delivery addresses with site contacts
  • Package count, dimensions and gross weight
  • FTL / PTL / container movement preference
  • Pickup date and receiving hours
  • Loading equipment, unloading support and access restrictions
USEFUL ANSWERS

Before you
move your cargo.

Which truck size is required?

Vehicle selection needs packed dimensions, weight, loading method and site access. A nominal vehicle length does not by itself establish safe loading capacity.

Can you transport a loaded shipping container?

Share the container size, gross weight, port and delivery details to check trailer suitability and service availability.

Is loading and unloading included?

It depends on the agreed scope. Identify who supplies labour, cranes, forklifts and securing materials before dispatch.